Stag Infra Project Ltd. is proud to announce the completion of the road construction of the 11.6 km road from Aava to Badoli in Tonk. The road width varies from 3.75 to 5.30 meters, including a 1-meter expansion on both sides. The construction process involved a strong base with 8 inches of GSV, followed by 8 inches of WMM and 80 mm of damar surface for durability. To support drainage and structural integrity, 1000 DI-K conveyer pipes were installed, along with pulleys constructed using concrete with valves. Additional work included 1-meter-deep cutting layered with 8 inches of GSV, 6 inches of WMM, 5 inches of DLC, and 6 inches of CC. For improved safety and visibility, 55 signboards and 55 kilometer stones were also installed along the route.
Aiming for a goal of long-term infrastructure sustainability, we are assigned as the partner in maintenance services for the coming 5 years. To ensure safety, we'll be responsible for routine inspections, timely repairs of any surface damage, cleaning of drainage systems, maintenance of signage and kilometer stones, and upkeep of the road shoulders. We ensure the roads remain in optimal condition, guaranteeing safe and uninterrupted transport.